1. Extra engineers who take a non-compensated leave/absence will forfeit guarantee for current payroll period.
2. Eliminate ability to exercise "hold down," "old
head" or "pass-up" rules while assigned on work/rest extra board.
3. Eliminate DEW list. No duty calls on rest days
4. Vacation scheduled as a single week must be scheduled to include a
minimum of (2) rest cycle days. Two or more weeks of vacation scheduled
consecutively must be taken as a single block. (Each week cannot be scheduled
independently.) The start of a vacation of 2 or more weeks in duration may be
moved to coincide with start of a work week.
5. Extra engineers will be required to use personal leave day(s), If any,
or single day(s) vacation, If any, before taking uncompensated leave. One
personal leave day or single day vacation must be used for each 24-hour period,
or portion thereof, extra engineer is absent.
6. An extra engineer still observing his/her rest day(s) (due to
trespassing) when his/her work group returns to service will be returned to
extra board with his/her work group and accordingly move up the board. He/she
will not be available for service until end of trespass time.4. Vacation
scheduled as a single week must be scheduled to include a minimum of (2) rest
cycle days. Two or more weeks of vacation scheduled consecutively must be taken
as a single block. (Each week cannot be scheduled independently.) The start of a
vacation of 2 or more weeks in duration may be moved to coincide with start of a
work week.
5. Extra engineers will be required to use personal leave day(s), If any,
or single day(s) vacation, If any, before taking uncompensated leave. One
personal leave day or single day vacation must be used for each 24-hour period,
or portion thereof, extra engineer is absent.
6. An extra engineer still observing his/her rest day(s) (due to
trespassing) when his/her work group returns to service will be returned to
extra board with his/her work group and accordingly move up the board. He/she
will not be available for service until end of trespass time.
7. "Undisturbed Hours-of-Service Rest" rule will not apply
after a call and release (where no duty is performed).
8. Extra engineer assigned to an outside vacancy will be returned to
extra board on rest days of such outside assignment and will not be permitted to
observe rest days of the outside assignment/vacancy.
9. Interpret existing work/rest cycle agreement provisions to permit
implementation of CMS addition/reduction matrix and universal calendar.
10. BLE agrees to implement these provision pending ratification for the
El Paso East and El Paso West extra boards. Implementations are to be effective
12:01 a.m. MST March 1, 2001.
11. Concurrent with implementation of these provisions, UPRR will
withdraw its notice to cancel the work/rest cycle agreements for the El Paso
East and El Paso West extra boards.
12. UPRR and BLE will promptly meet to develop and finalize agreement
language covering these provisions for BLE ratification.
13. UPRR and BLE will promptly meet to develop and finalize crew
scheduling arrangements for pools protected by the El Paso East and West extra
boards.